Shanghai International Mining Exchange
| Project Information | ||||
| Project No. | 20170110382810 | |||
| Project Name | A Serpentinite Rock Transfer in Inner Mongolia | |||
| Project Classification | Property right of a mining company | |||
| Location | Inner Mongolia | |||
| Minerals | Serpentinite Rock | |||
| Project Information | Mining area | 22.15km2 | ||
| Reserves/grade | The field work has been completed in the end of 2013, and the detail is shown below: Resource reserves of the serpentinite rock: 633 million tons, including 245.6 million tons of MgO (average grade of 38.8%), 227.9 milion tons of SiO2 (average grade of 36%), 1,323kt metal of Ni (average grade of 0.209%), 6,330kt metal of Co (average grade of 0.001%), 26,270kt metal of iron (average grade of 4.15%), 2,608kt of Cr2O3 (average grade of 0.412%), 709kt TiO2 (average grade of 0.112%), and other elements associated with copper, silver, gold, platinum and palladium. |
|||
| Mining method | ||||
| Supporting facilities | ||||
| Others | Time of field work: Year 2007 – 2013. Trenching: 26km3 Drilling: 34km Samples: 13,474pcs Capital invest: RMB 94,180,000
4 ore bodies are delineated to estimate the reserves: Ore body No. 1: Length: 1,700m Average thickness: 172.7m, Average grade of MgO: 38.86% Ore body No. 2: Length: 1,740m, Average thickness: 90.39m, Average grade of MgO: 40.51% The quality during the prospecting agrees with The code requirement, and it is able to meet the demand of mine design in the future. |
|||
| Progress | Detailed survey has been completed | |||
| Cooperation | Full Transfer | |||
| Keywords | ||||
| Listing | ||||
| Quoted Price | ||||
| Deadline | ||||
| Address | Zip Code | |||
| Name | Website | |||
| Telephone | Fax | |||
| Mobile phone | ||||


