Shanghai International Mining Exchange
Project Information | ||||
Project No. | 20160710181560 | |||
Project Name | PL9649/2014 gold mine in Mala of Tanzania | |||
Project Classification | Noble Metal | |||
Location | Tanzania | |||
Minerals | Gold | |||
Project Information | Mining area | 35.24km2 | ||
Reserves/grade | The prospecting area is located in important gold ore greenstone belt of Tanzania. There are a lot of civilian gold mining points in this area. Several gold abnormal points and 4 ore prediction areas are delineated and the spreading direction is the same to the ore-controlling structure of the prospecting area. The prospecting area is in good condition of mineralization and low extent of geological work. Hopefully middle-large sized gold deposit may be found when the prospecting work is carried out. |
|||
Mining method | ||||
Supporting facilities | ||||
Others | License condition: Period of validity : 27th March 2014 to 26th March 2018
Geography location: -The project is located in northeast of Mala in Tanzania. Botiyama of Mala has the jurisdiction over the mining area. -40km away from capital Musoma and 190km away from Mwanza a city mine.
Features of mine bodies: Gold-bearing construction alteration zones was found in west、middle and east of the prospecting area. In west, 3 gold mineralization alteration zones were found. Tendency: 300-305°; Trend angle: 75°; Extension:300m; Lateral extensibility :90m; Bandwidth:02.80-2.50m; Grade:2.70-4.50g/t.
In the middle area, there are also 3 gold mineralization alteration zones were found. Tendency: 75°, Extension: more than 250m, Width: 0.3-1.5m, Grade: 5.20-20g/t.
In the east area: 3 gold mineralization alteration zones. Extension:350m, Width:0.50-2.00m
Ore quality: The alteration is mainly of silicification, pryritization, carbonatation, and chloritization; Texture of ores: granular texture, mesh-vein, and fractionation; Structure of ores: disseminated structure, thin vein, crumby and honeycomb structure.
|
|||
Progress | Geophysical prospecting and chemical prospecting were completed, the entire work was gotten to pre-survey. 1:10,000 aeromagnetic: 35.24km2 1:25,000 soil geochemical: 35.24km2 , geochemical sampling:2,404 pieces Drilling engineering: 1,054.4m (4 drills) Costean:1,651.45 m3 (17 strips) | |||
Cooperation | -Flexible corporation -Open for discussion | |||
Keywords | ||||
Listing | ||||
Quoted Price | ||||
Deadline | ||||
Address | Zip Code | |||
Name | Website | |||
Telephone | Fax | |||
Mobile phone |