Shanghai International Mining Exchange
Project Information | ||||
Project No. | 20160810280730 | |||
Project Name | The project of iron mine transfer in Shanxi | |||
Project Classification | Ferrous metal | |||
Location | Shanxi | |||
Minerals | iron | |||
Project Information | Mining area | |||
Reserves/grade | the reserve of the iron ore is 20 million tons which the strip mining reserve is 10 million tons. And loss will be about 2 million tons. Total proved iron resource reserves: 20 million tons, including: 10 million tons design-mining-reserves of open-pit mining; 2 million tons design loss. |
|||
Mining method | Open-pit mining | |||
Supporting facilities | The mine is 25km to the county town, 7km to the office of the town. So the life is convenient here. The transport is very convenient as well. Land Route: There is cement road in the mining area and it is 4.2km to the county road and provincial road; 6km to the railway station. Water Route: 9km to the wharf. Overall, the location of the mining area is with good advatanges. The iron ore is 25km away from country, 7km away from the office of village and town. The work’s life and transport are very convenient. There is a landway of 4.2km long connecting mining area and the country/provincial road which is 6km away from railway station. As to waterway, the mining area is 9km away from wharf. So the regional advantage is obvious. | |||
Others | There is a mining right of iron on the surface of the mine, which is got according to law. The 20-year-extend mining right for open-pit mining and underground mining has been approved by the Office of Land and Resources. The project company got the deep mining right of iron and sulfur by the auction in the Office of Land and Resources. Others: The project has a legal mining right of strip iron mine. Land resource department has recently approved mining right of surface and underground in next 20 years. Mining right of deep iron mine and sculpture mine were also bought legally from land resource department.
The mine is shut down for the low price and equipment maintenance in the end of 2015. But it can put back to normal production soon and with great profitability that you can get profit as soon as you buy the mine. Because of the low price and equipment overhaul, the mine stopped production in 2015. But it will be put back into production soon. |
|||
Progress | ||||
Cooperation | -Flexible cooperation -Open for discussion | |||
Keywords | ||||
Listing | ||||
Quoted Price | ||||
Deadline | ||||
Address | Zip Code | |||
Name | Website | |||
Telephone | Fax | |||
Mobile phone |