Shanghai International Mining Exchange
Project Information | ||||
Project No. | 20160810382740 | |||
Project Name | The project of Khakass gold mine transfer and cooperative in Russia | |||
Project Classification | Noble metal | |||
Location | Russia | |||
Minerals | Gold | |||
Project Information | Mining area | |||
Reserves/grade | Project company No.1: Total reserves in the mining area (industrial and non-industrial): 1,150kg.
Project company No.2: Registered reserves: Gold, Level C1:3,356kg, Level C2:6,407kg. Silver, Level C1:2.3t, Level C2:2.1t. - Gold reserves in lean ore waste storage: 3.4t -Proved but unrecorded geological reserves: 20.6t. -Predicted reserves out of temporary mining land boundary: 45t. |
|||
Mining method | ||||
Supporting facilities | ||||
Others | -Project company No.1: The company was equipped with all kinds of mining machineries including dumper, Ek-270 and Hyundai R450LC-7 grab,T-25, T-20,T-11,Hill-pushed SD-16 and SD-32 bulldozer and etc. ,which can perform well in every difficult construction sites. Cars: Ural and Kamaz gasoline transport cart, Wall Si, varnish, big truck trailer, semitrailer, barracks of mobile type and etc. These equipments insure every independent production unit to carry out difficult work rapidly and stably in remote area. The company brought in new equipments(TOK-100,TOK-200) with 3-fold production capacity to replace intrinsic waterpower ore-washing facility Meanwhile, the commissioning of fashioning is helpful for upgrading the recovery of gold grains and reducing the losses in fashioning. -Project company No.2: T-35 and T9 bulldozer, EKgrab, mining dumper, corollary equipment of hydrometallurgy, vehicle of popular type.
Others: -Project company No.1: (have ore resources in different mining areas) Since the establishment of the company 35 years ago, noble metal mining and road construction is now being the main business. Gold exploitation quantity was 200-500kg per year. The company’s management group are composed by high-level specialist with 6-35 years working experience in switchgear industry and able to finish mining work in difficult terrain and weather conditions. The company has license of construction and design, as well as authority on mining survey and geodetic surveying, facilities and license. The mining area being exploited now has a total ore extent of 1150kg. The reserves may increase when more geological exploration work is carried out. -Project company No.2:(project company with single mine) The company was established in 2009, which works mainly on gold development in republic of Kathy. Sara lim gold mine is located in Republic of Kathy, 85km away from the southwest of Kopije railway station (Anbar-Achinsk railway branch line). Since 1899, the company prospected and developed may ore-bearing veins including Andreev, cascades and etc. During the past hundreds of year, total amount about 20 veins were found. The associated ore was silver and this mine was sealed up for safekeeping. |
|||
Progress | ||||
Cooperation | Open for discussion | |||
Keywords | ||||
Listing | ||||
Quoted Price | ||||
Deadline | ||||
Address | Zip Code | |||
Name | Website | |||
Telephone | Fax | |||
Mobile phone |