Shanghai International Mining Exchange
Project Information | |||||||||||||||||||||||||||
Project No. | 20160710180780 | ||||||||||||||||||||||||||
Project Name | A super-huge lithiotantite development project in Jiabusi, Inner Mongolia | ||||||||||||||||||||||||||
Project Classification | Other | ||||||||||||||||||||||||||
Location | Inner Mongolia | ||||||||||||||||||||||||||
Minerals | lithiotantite | ||||||||||||||||||||||||||
Project Information | Mining area | 2.34 km2 | |||||||||||||||||||||||||
Reserves/grade | The estimated reserves (122b+333+333low) are in the following chart which is with the ore extent of 56,541.4kt
The resource and reserves available now are shown below, which is with the ore extent of 33,170kt.
|
||||||||||||||||||||||||||
Mining method | Underground mining | ||||||||||||||||||||||||||
Supporting facilities | - The mining area is linked with rough road, so the transportation here is quite convenient. - Water supply: With 2 wells for drinking and 2 driven wells for mining live. If the water consumption is huge for production, it is need to draw water from the river tens of kilometers away. - Electricity supply: a 110kw hv substation 20km away from the mining area; 2 10,000V transmission lines located in the east and west which are 1.5km to the mining area. There are several roads though out the mining zone, so the transport is very convenient. There are 2 dug wells and 2 motor-pumped wells which provided enough water for life. If production need more water, we can draw water from rivers 10 kilometers away. There are a 110KW high voltage transformer substation 20Km away from the mine as well as two 1000v electric lines in 1.5 Km of the west and east. So the electric power is absolutely enough for use. | ||||||||||||||||||||||||||
Others | The breakage in this area is mainly open and distribute direction are in disorder. The breakage is far away from mine body and don’t have the destructive effect on mine body.
Jiabusi Lithiotantite rare ore deposit is located in the center of sunken arched area in Inner Mongolia. It can be divided into several types including albite、tantalum of lepidolite granite mode、niobium lithium、rubidium、caesium deposit. The ore body is 900m length and 1000m in depth which moves from north to south and trend east. The thickness of ore body is 1.07~82.09m, average is 36.91m. It’s a stable form of thickness variation. Tantalum and niobium mineral is mainly microlitein ore. Geologic features:
Valid period of the mining right: 06th November 2014---06thNovember 2020
|
||||||||||||||||||||||||||
Progress | |||||||||||||||||||||||||||
Cooperation | - Flexible cooperation - Open for discussion | ||||||||||||||||||||||||||
Keywords | |||||||||||||||||||||||||||
Listing | |||||||||||||||||||||||||||
Quoted Price | |||||||||||||||||||||||||||
Deadline | |||||||||||||||||||||||||||
Address | Zip Code | ||||||||||||||||||||||||||
Name | Website | ||||||||||||||||||||||||||
Telephone | Fax | ||||||||||||||||||||||||||
Mobile phone |